Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-water-bluet  Charlotte Water / Construction

Irwin Creek WWTP Stormwater Improvements Project

Details

Print Download
Add to Calendar 2026-05-01 2026-05-01 Irwin Creek WWTP Stormwater Improvements Project

This construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.

Posting Number 05 2026-Q2(Apr-Jun)-CW-19830

Anticipated Posting Date 2026-05-01

Commodity Code(s): 91200, 91359, 91389, 91391

This construction contract will replace existing diesel pumps with electric submersible pumps. This will be done at three locations at the existing stormwater outfall locations. The project will also include installation of permanent discharge piping at stormwater outfall 1. This will require electrical duct bank along with wiring and all necessary components to power the pumps.

Requirements

Last Updated: 12/30/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov