Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-water-bluet  Charlotte Water / Construction

Lee Dukes Alum Bulk Storage Replacement

Details

Print Download
Add to Calendar 2026-04-01 2026-04-01 Lee Dukes Alum Bulk Storage Replacement

This construction contract is for the replacement of the Alum Bulk Storage tanks at the Lee Dukes Water Treatment Plant. The project will also include replacement of the existing piping between the day tanks and the bulk storage and the piping between the bulk storage tank to the delivery fill location.

Posting Number 04 2026-Q2(Apr-Jun)-CW-19828

Anticipated Posting Date 2026-04-01

Commodity Code(s): 91200, 91360, 91389, 91392

This construction contract is for the replacement of the Alum Bulk Storage tanks at the Lee Dukes Water Treatment Plant. The project will also include replacement of the existing piping between the day tanks and the bulk storage and the piping between the bulk storage tank to the delivery fill location.

Requirements

Last Updated: 12/30/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Abby Dolan

City Contact

adolan@charlottenc.gov