This contract will be for the construction of a 250,000 gallon-per-day duplex lift station and demolition of the existing wastewater treatment package plant. Included will be the construction of an emergency containment basin, upsizing of an existing gravity sewer, installation of a portion of an 8″ force main, new wet well. Owner plans to procure pumps and standby generator for the project.
Posting Number 05 2027-Q2(Apr-Jun)-CW-19822
Anticipated Posting Date 2027-05-01
Commodity Code(s): 91200, 91359, 91389
This contract will be for the construction of a 250,000 gallon-per-day duplex lift station and demolition of the existing wastewater treatment package plant. Included will be the construction of an emergency containment basin, upsizing of an existing gravity sewer, installation of a portion of an 8″ force main, new wet well. Owner plans to procure pumps and standby generator for the project.