Aviation / Construction
Phase II of the Perimeter Fence Upgrade project aims to enhance airfield security and safety by mitigating hazards posed by large terrestrial wildlife and preventing unauthorized access to the airfield. This phase includes the replacement of approximately 21,000 linear feet of perimeter fencing along Runway 18R/36L, as well as upgrades to select airfield gates. The project will increase the fence height from 6 feet to 10 feet and implement targeted gate modifications to align with FAA Cert Alert 16-03 and the Airport Security Plan (ASP).
Posting Number 01 2026-Q1(Jan-Mar)-AVI-19529
Anticipated Posting Date 2026-01-13
Commodity Code(s): 90910, 93673, 98815, 99022
Phase II of the Perimeter Fence Upgrade project aims to enhance airfield security and safety by mitigating hazards posed by large terrestrial wildlife and preventing unauthorized access to the airfield. This phase includes the replacement of approximately 21,000 linear feet of perimeter fencing along Runway 18R/36L, as well as upgrades to select airfield gates. The project will increase the fence height from 6 feet to 10 feet and implement targeted gate modifications to align with FAA Cert Alert 16-03 and the Airport Security Plan (ASP).
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!