Earlybird, Business Opportunity Pipeline, City of Charlotte

engineering-property-management-bluet  Department of General Services / Construction

Robinson Church Road Widening – Phase 1

Details

Print Download
Add to Calendar 2027-01-01 2027-01-01 Robinson Church Road Widening – Phase 1

Widen Robinson Church Road from WT Harris Blvd. to the Plott Road/Highland Avenue intersection from two lanes to three lanes with intermittent islands. Amenities include: curb & gutter, shared-use path, planting strip, underground stormwater filers, accessible ramps, and mid-block crossings. Includes the construction of a roundabout.

Posting Number 01 2027-Q1(Jan-Mar)-DGS-19425

Anticipated Posting Date 2027-01-01

Commodity Code(s): 74505, 91219, 91223, 91319, 91345, 91347, 91371, 91396, 91430, 96218, 96239, 96861, 96888, 98814, 98852

Widen Robinson Church Road from WT Harris Blvd. to the Plott Road/Highland Avenue intersection from two lanes to three lanes with intermittent islands. Amenities include: curb & gutter, shared-use path, planting strip, underground stormwater filers, accessible ramps, and mid-block crossings. Includes the construction of a roundabout.

Requirements

Last Updated: 11/21/25
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.winebrenner@charlottenc.gov