Charlotte Storm Water Services / Construction
Old Plank portion of project: Project initiated due to failure of 84” CMP system on Old Plank Rd. City plans to remove and replace 86” CMP with 56LF 8’x7’ RCBC; Add (2) concrete wingwalls;
Caldwell Williams portion of project: Project initiated due to road flooding. City plans to replace (2) 60” CMP pipes with 39 LF of 13×5 Box culvert. City also intends to add 40LF of 18” RCP; (2) Double catch basins and (2) concrete wingwalls; Pavement and curb replacement.
Posting Number 10 2026-Q4(Oct-Dec)-CSWS-19059
Anticipated Posting Date 2026-10-12
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
Old Plank portion of project: Project initiated due to failure of 84” CMP system on Old Plank Rd. City plans to remove and replace 86” CMP with 56LF 8’x7’ RCBC; Add (2) concrete wingwalls;
Caldwell Williams portion of project: Project initiated due to road flooding. City plans to replace (2) 60” CMP pipes with 39 LF of 13×5 Box culvert. City also intends to add 40LF of 18” RCP; (2) Double catch basins and (2) concrete wingwalls; Pavement and curb replacement.
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!