Add to Calendar 2026-04-06 2026-04-06 Cedar Croft Dr 6315 Ph 2

Project initiated due to failure of 96” system. City plans to remove and replace 96” CMP with 62LF 9’x6’ RCBC; Add (2) concrete wingwalls; Add (1) DCB CLDS 20.03; Add (1) CLDS 20.05; Add (2) NCDOT 840.01 CB’s; City plans to add approx. 87 LF of 15” RCP; Curb and gutter replacement; pavement resurfacing.

Posting Number 04 2026-Q2(Apr-Jun)-CSWS-19055

Anticipated Posting Date 2026-04-06

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Project initiated due to failure of 96” system. City plans to remove and replace 96” CMP with 62LF 9’x6’ RCBC; Add (2) concrete wingwalls; Add (1) DCB CLDS 20.03; Add (1) CLDS 20.05; Add (2) NCDOT 840.01 CB’s; City plans to add approx. 87 LF of 15” RCP; Curb and gutter replacement; pavement resurfacing.

Requirements

Last Updated: 11/21/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov