Charlotte Storm Water Services / Construction
Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.
Posting Number 04 2026-Q2(Apr-Jun)-CSWS-19041
Anticipated Posting Date 2026-04-26
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!