charlotte-area-transit-system-bluet  Charlotte Area Transit System, Department of General Services / Construction

CATS – N. Davidson EV Charger Install

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-08-25 2025-08-25 CATS – N. Davidson EV Charger Install

The scope of work for this project is to install a new 1,200 amp, 480/277V service, including feeder connections to a new Duke Energy provided utility transformer. This new service shall, in turn, supply power to the new electric vehicle charging equipment. A total of thirteen (13) level 2 EV dual port chargers and one (1) 200 kW DC fast charger shall be installed. Chargers are owner provided, and contractor installed.

Posting Number 08 2025-Q3(Jul-Sep)-CATS-18886

Anticipated Posting Date 2025-08-25

Commodity Code(s): 91200, 91356, 91438

The scope of work for this project is to install a new 1,200 amp, 480/277V service, including feeder connections to a new Duke Energy provided utility transformer. This new service shall, in turn, supply power to the new electric vehicle charging equipment. A total of thirteen (13) level 2 EV dual port chargers and one (1) 200 kW DC fast charger shall be installed. Chargers are owner provided, and contractor installed.

Requirements

Last Updated: 09/08/25
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Jason Phelan

City Contact

jason.phelan@charlottenc.gov