Charlotte Area Transit System, Department of General Services / Construction
The scope of work for this project is to install a new 1,200 amp, 480/277V service, including feeder connections to a new Duke Energy provided utility transformer. This new service shall, in turn, supply power to the new electric vehicle charging equipment. A total of thirteen (13) level 2 EV dual port chargers and one (1) 200 kW DC fast charger shall be installed. Chargers are owner provided, and contractor installed.
Posting Number 08 2025-Q3(Jul-Sep)-CATS-18886
Anticipated Posting Date 2025-08-25
Commodity Code(s): 91200, 91356, 91438
The scope of work for this project is to install a new 1,200 amp, 480/277V service, including feeder connections to a new Duke Energy provided utility transformer. This new service shall, in turn, supply power to the new electric vehicle charging equipment. A total of thirteen (13) level 2 EV dual port chargers and one (1) 200 kW DC fast charger shall be installed. Chargers are owner provided, and contractor installed.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!