Charlotte Water / Construction
The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.
Posting Number 07 2027-Q3(Jul-Sep)-CW-18598
Anticipated Posting Date 2027-07-15
Commodity Code(s): 91200, 91359, 91360
The Ashe Plantation Lift Station project involves the design, bidding, and construction of a new lift station utilizing the existing wet well built during Phase I of the Ashe Plantation Wastewater Treatment Plant. The proposed system is a duplex lift station with a capacity of 320 gallons per minute, which will connect to an 8-inch forcemain. This new infrastructure will convey wastewater to the Goose Creek basin. As part of the project, the existing package treatment plant will be decommissioned.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!