Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Pella Rd 6212 Project

Details

Print Download
Add to Calendar 2026-07-04 2026-07-04 Pella Rd 6212 Project

Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP.  Three non-standard and three standard structures will be removed/replaced as well as two headwalls.  57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed.  70 LF of an 8″ water main will also be relocated.

Posting Number 07 2026-Q3(Jul-Sep)-CSWS-17295

Anticipated Posting Date 2026-07-04

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Project consist of joint repairs and the lining of 563 LF of 66 CMP with CIPP.  Three non-standard and three standard structures will be removed/replaced as well as two headwalls.  57 LF of 24 inch RCP will be removed and replaced. A rip rap apron will be revised/installed.  70 LF of an 8″ water main will also be relocated.

Requirements

Last Updated: 02/06/26
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Colleen Tully

City Contact

Colleen.Tully@charlottenc.gov