aviation-bluet  Aviation / Architectural / Engineering Services

Airport Surveillance Radar and Center Lighting Vault Relocation (Design)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-09-03 2025-09-03 Airport Surveillance Radar and Center Lighting Vault Relocation (Design)

The South Ramp Expansion Program for Charlotte Douglas International Airport (also referred to as “CLT,” “Airport,” or “Owner”) consists of the design and construction of a three-phase program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. South Ramp Expansion Phase I will provide unimpeded dual Airplane Design Group (ADG) III and V taxilanes for the southeast area. Phase II will provide continuity of the unimpeded dual ADG III and V taxilanes for the center area of the ramp. The program also provides for the relocations of the Airport Surveillance Radar (ASR) and of the Center Lighting Vault, the two projects that are the subject of this RFQ. Finally, Phase III will complete the linear and unimpeded taxilane connectivity for the southwest corner of the terminal ramp.

This Request for Qualifications will be used to select a Firm to provide the design, construction administration, and related services for the two facility relocation projects within the existing scope of the program as described above. The current program consists of 5 projects, three airfield and two enabling facility relocations, which are listed below:

  • South Ramp Expansion Phase 1 (not a subject of this RFQ)
  • South Ramp Expansion Phase 2 (not a subject of this RFQ)
  • South Ramp Expansion Phase 3 (not a subject of this RFQ)
  • Airport Surveillance Radar Relocation (ASR) (the subject of this RFQ)
  • Center Airfield Electrical Lighting Vault Relocation (CLV) (the subject of this RFQ)

Posting Number 09 2025-Q3(Jul-Sep)-AVI-17240

Anticipated Posting Date 2025-09-03

Commodity Code(s): 92517, 92536, 92546

Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/ASR-Lighting-Vault-Design

The South Ramp Expansion Program for Charlotte Douglas International Airport (also referred to as “CLT,” “Airport,” or “Owner”) consists of the design and construction of a three-phase program targeted to enhance capacity and improve efficiency of the terminal ramp by addressing ramp congestion, improving taxi times and enhancing safety. South Ramp Expansion Phase I will provide unimpeded dual Airplane Design Group (ADG) III and V taxilanes for the southeast area. Phase II will provide continuity of the unimpeded dual ADG III and V taxilanes for the center area of the ramp. The program also provides for the relocations of the Airport Surveillance Radar (ASR) and of the Center Lighting Vault, the two projects that are the subject of this RFQ. Finally, Phase III will complete the linear and unimpeded taxilane connectivity for the southwest corner of the terminal ramp.

This Request for Qualifications will be used to select a Firm to provide the design, construction administration, and related services for the two facility relocation projects within the existing scope of the program as described above. The current program consists of 5 projects, three airfield and two enabling facility relocations, which are listed below:

  • South Ramp Expansion Phase 1 (not a subject of this RFQ)
  • South Ramp Expansion Phase 2 (not a subject of this RFQ)
  • South Ramp Expansion Phase 3 (not a subject of this RFQ)
  • Airport Surveillance Radar Relocation (ASR) (the subject of this RFQ)
  • Center Airfield Electrical Lighting Vault Relocation (CLV) (the subject of this RFQ)

Requirements

Last Updated: 09/08/25
Insurance Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Ryan Lingholm

Procurement Officer

Ryan.Lingholm@ci.charlotte.nc.us