charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Architectural / Engineering Services

Unspecified Pond/Dam and Water Quality Improvement Projects

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-12-19 2024-12-19 Unspecified Pond/Dam and Water Quality Improvement Projects

The selected firms will use HEC-HMS, HEC-RAS, SWMM, and/or a hydraulic grade line closed system computer model, or an approved alternative method. All methods will be in accordance with the Charlotte-Mecklenburg Storm Water Design Manual. The City’s then current AutoCAD standards will be used for production of all plans and profiles.

Work will be issued via written Task Orders, which will specify the requirements of the various projects. Multiple Task Orders may be issued for each project. Multiple task orders may be issued at once.  The City of Charlotte reserves the right, upon successful completion of a given Task Order, to issue subsequent Task Orders to the same or a different Company.

The below list provides a general list of the tasks required.  This is not intended to be all-inclusive, nor is it guaranteed that all of the below tasks will be utilized.  A more defined Scope of Work will be developed during negotiation with the selected company.

Posting Number 12 2024-Q4(Oct-Dec)-CSWS-16740

Anticipated Posting Date 2024-12-19

Commodity Code(s): 91842, 92500, 92517, 92536, 92546, 92670, 92672

Solicitation Link: https://charlottenc.bonfirehub.com/projects/166111/details

The selected firms will use HEC-HMS, HEC-RAS, SWMM, and/or a hydraulic grade line closed system computer model, or an approved alternative method. All methods will be in accordance with the Charlotte-Mecklenburg Storm Water Design Manual. The City’s then current AutoCAD standards will be used for production of all plans and profiles.

Work will be issued via written Task Orders, which will specify the requirements of the various projects. Multiple Task Orders may be issued for each project. Multiple task orders may be issued at once.  The City of Charlotte reserves the right, upon successful completion of a given Task Order, to issue subsequent Task Orders to the same or a different Company.

The below list provides a general list of the tasks required.  This is not intended to be all-inclusive, nor is it guaranteed that all of the below tasks will be utilized.  A more defined Scope of Work will be developed during negotiation with the selected company.

Requirements

Last Updated: 12/19/24
Insurance Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Katherine Osborne

City Contact

katherine.osborne@charlottenc.gov