Charlotte Storm Water Services / Architectural / Engineering Services
Unspecified Pond/Dam and Water Quality Improvement Projects
Details
The selected firms will use HEC-HMS, HEC-RAS, SWMM, and/or a hydraulic grade line closed system computer model, or an approved alternative method. All methods will be in accordance with the Charlotte-Mecklenburg Storm Water Design Manual. The City’s then current AutoCAD standards will be used for production of all plans and profiles.
Work will be issued via written Task Orders, which will specify the requirements of the various projects. Multiple Task Orders may be issued for each project. Multiple task orders may be issued at once. The City of Charlotte reserves the right, upon successful completion of a given Task Order, to issue subsequent Task Orders to the same or a different Company.
The below list provides a general list of the tasks required. This is not intended to be all-inclusive, nor is it guaranteed that all of the below tasks will be utilized. A more defined Scope of Work will be developed during negotiation with the selected company.
Posting Number 12 2024-Q4(Oct-Dec)-CSWS-16740
Anticipated Posting Date 2024-12-19
Commodity Code(s): 91842, 92500, 92517, 92536, 92546, 92670, 92672
Solicitation Link: https://charlottenc.bonfirehub.com/projects/166111/details
The selected firms will use HEC-HMS, HEC-RAS, SWMM, and/or a hydraulic grade line closed system computer model, or an approved alternative method. All methods will be in accordance with the Charlotte-Mecklenburg Storm Water Design Manual. The City’s then current AutoCAD standards will be used for production of all plans and profiles.
Work will be issued via written Task Orders, which will specify the requirements of the various projects. Multiple Task Orders may be issued for each project. Multiple task orders may be issued at once. The City of Charlotte reserves the right, upon successful completion of a given Task Order, to issue subsequent Task Orders to the same or a different Company.
The below list provides a general list of the tasks required. This is not intended to be all-inclusive, nor is it guaranteed that all of the below tasks will be utilized. A more defined Scope of Work will be developed during negotiation with the selected company.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!