Charlotte Storm Water Services / Construction
Collective Storm Drainage Improvement Projects Series AJ
Details
Collective Storm Drainage Improvement Projects Series AJ will involve 6 projects throughout the City of Charlotte, 1614 Lombardy Circle, 2033 Teddington Drive, 2316 Kilborne Drive, 10513 Moss Mill Lane, 435 Norwood Drive, and 5447 Kerry Glen Lane. These projects will consist of reinforced concrete pipe replacement and realignment. The project pipe will consist of a range of different sizes from 15 inch to 36 inch as well as some elliptical pipe. These projects will also consist of CIPP liner, storm drainage structure replacement, non-standard endwalls, full depth asphalt, curb and gutter, concrete driveway, foundation assessment, foundation protection, boulder toe, soil lifts, and watermain replacement.
Posting Number 03 2025-Q1(Jan-Mar)-CSWS-16566
Anticipated Posting Date 2025-03-15
Commodity Code(s): 74505, 91200, 91244, 91244, 91345, 92912, 92915
Collective Storm Drainage Improvement Projects Series AJ will involve 6 projects throughout the City of Charlotte, 1614 Lombardy Circle, 2033 Teddington Drive, 2316 Kilborne Drive, 10513 Moss Mill Lane, 435 Norwood Drive, and 5447 Kerry Glen Lane. These projects will consist of reinforced concrete pipe replacement and realignment. The project pipe will consist of a range of different sizes from 15 inch to 36 inch as well as some elliptical pipe. These projects will also consist of CIPP liner, storm drainage structure replacement, non-standard endwalls, full depth asphalt, curb and gutter, concrete driveway, foundation assessment, foundation protection, boulder toe, soil lifts, and watermain replacement.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!