Department of General Services / Construction
WT Harris SUP (JW Clay to N Tryon)
Details
A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path. Project Length = 0.33 miles.
Posting Number 04 2026-Q2(Apr-Jun)-DGS-16498
Anticipated Posting Date 2026-04-01
Commodity Code(s): 55078, 91219, 91223, 91244, 91319, 91345, 91347, 91361, 91430, 92586, 96861, 96884, 98814
A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path. Project Length = 0.33 miles.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
For Questions, Contact:
Mackenzie Winebrenner
City Contact