charlotte-water-bluet  Charlotte Water / Construction

Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) Disinfection System Upgrades

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-02-07 2025-02-07 Sugar Creek Water Resource Recovery Facility (WRRF) Ultraviolet (UV) Disinfection System Upgrades

This project involves the replacement of the existing ultraviolet disinfection system at the Sugar Creek Water Resource Recovery Facility. The scope of work includes upgrading the UV disinfection system while utilizing the existing UV channels, extending these channels, and replacing the current level control gates with fixed finger weirs. A new non-potable water (NPW) pump station wet well will be added, and the drain valve of the East Equalization Basin will be replaced. During this upgrade, a temporary disinfection system will be provided to maintain disinfection while the UV system is out of service. Additionally, two existing NPW pumps will be relocated, and three NPW pumps will be replaced in kind. The Filter Backwash Return Pump wet well work will include the installation of a backwash return pump, the necessary piping and valves, and the replacement of a flow meter.

Posting Number 02 2025-Q1(Jan-Mar)-CW-16470

Anticipated Posting Date 2025-02-07

Commodity Code(s): 91200, 91345, 91359, 91360, 91389

This project involves the replacement of the existing ultraviolet disinfection system at the Sugar Creek Water Resource Recovery Facility. The scope of work includes upgrading the UV disinfection system while utilizing the existing UV channels, extending these channels, and replacing the current level control gates with fixed finger weirs. A new non-potable water (NPW) pump station wet well will be added, and the drain valve of the East Equalization Basin will be replaced. During this upgrade, a temporary disinfection system will be provided to maintain disinfection while the UV system is out of service. Additionally, two existing NPW pumps will be relocated, and three NPW pumps will be replaced in kind. The Filter Backwash Return Pump wet well work will include the installation of a backwash return pump, the necessary piping and valves, and the replacement of a flow meter.

Requirements

Last Updated: 11/14/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Daniel Lindholm

City Contact

daniel.lindholm@charlottenc.gov