engineering-property-management-bluet  Department of General Services / Construction

Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2026-07-01 2026-07-01 Mallard Creek Road Shared-Use Path (Governor Hunt to Driwood)

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

Posting Number 07 2026-Q3(Jul-Sep)-DGS-16281

Anticipated Posting Date 2026-07-01

Commodity Code(s): 55078, 74505, 74565, 90976, 91200, 91219, 91223, 91240, 91244, 91319, 91345, 91347, 91371, 91396, 91430, 96185, 96861, 96882, 96884, 98814, 98815

This project will construct a shared-use path along the east side of Mallard Creek Road from Governor Hunt Road to Driwood Court. Specific improvements will also include construction of a plant strip, curb and cutter, accessible ramps, driveways, and potential storm drainage improvements. The purpose of this project is to improve pedestrian safety, mobility, and connectivity along Mallard Creek Road. Project Length = 0.4 miles.

Requirements

Last Updated: 02/03/25
Insurance Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.Winebrenner@charlottenc.gov