CHARLOTTE-MECKLENBURG STORM WATER SERVICES

Partner with Charlotte on Stormwater Management Projects

Charlotte-Mecklenburg Storm Water Services manages runoff, reduces flooding risks, and protects water quality across the City of Charlotte and Mecklenburg County. Engage with us through stormwater RFPs and other city contracts for bid opportunities. 

Charlotte-Mecklenburg Storm Water Services is a joint municipal/county stormwater utility that includes the City of Charlotte, the surrounding towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and Pineville and Mecklenburg County. Storm Water Services works year-round to manage residents’ drainage and flooding concerns, monitoring surface waters for pollutants, and educating residents about flood safety, pollution prevention, and volunteer opportunities. Businesses can partner with Charlotte-Mecklenburg Storm Water Services through government drainage contracts and drainage maintenance contracts. Explore the city of Charlotte bid opportunities to contribute to repairing and replacing drainage infrastructure, restoring eroded streams and floodplains, mapping floodplains, and managing floodplain development. 

62

IN DEVELOPMENT OPPORTUNITIES

0

ACTIVE OPPORTUNITIES

Clear

Opportunities per Page

In Development charlotte water

Charlotte Storm Water Services / Construction

Crestmont Drive (4724) Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-3471
  • Anticipated Posting Date: 2025-12-15
  • Last Updated: 10/03/25
Add to Calendar 2025-12-15 2025-12-15 Crestmont Drive (4724) Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

In Development charlotte water

Charlotte Storm Water Services / Construction

Four Mile Creek Rd 9427

  • Posting Number: 2026-Q1(Jan-Mar)-CSWS-19053
  • Anticipated Posting Date: 2026-03-26
  • Last Updated: 10/02/25
Add to Calendar 2026-03-26 2026-03-26 Four Mile Creek Rd 9427

Project initiated to address a failing 48” CMP culvert. The culvert crosses a high hazard dam with deficiency’s that will be addressed by a private HOA. The city intends to install approx. 80LF of 48” RCP and tie into an existing concrete flume; remove and replace approx. 40LF of 15” RCP; add (1) DCB; add (2) CBs; add (1) winged headwall

In Development charlotte water

Charlotte Storm Water Services / Construction

1206 Georgetown

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-19051
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 10/02/25
Add to Calendar 2026-04-01 2026-04-01 1206 Georgetown

The project is bounded by Pondella Drive to the West and North, Georgetown Drive to the South and Rosada Ave to the East.  The project involves storm drainage improvements along Georgetown Rd primarily with some improvements in intersections with Rosada Avenue and Pondella Drive.

In Development charlotte water

Charlotte Storm Water Services / Construction

Reece Rd

  • Posting Number: 2026-Q3(Jul-Sep)-CSWS-19049
  • Anticipated Posting Date: 2026-09-01
  • Last Updated: 10/02/25
Add to Calendar 2026-09-01 2026-09-01 Reece Rd

The project is bounded by the Park Rd Shopping Center to the South, Park Rd to the West, Arbor Lane to the North and Little Sugar Creek to the East.  The project involves storm drainage improvements along Reece Rd primarily with some improvements in intersections with Park Rd and Arbor Lane.

In Development charlotte water

Charlotte Storm Water Services / Construction

Moorland Dr 3831

  • Posting Number: 2026-Q4(Oct-Dec)-CSWS-19047
  • Anticipated Posting Date: 2026-12-01
  • Last Updated: 10/02/25
Add to Calendar 2026-12-01 2026-12-01 Moorland Dr 3831

Moorland Dr is a double barrel culvert that is undersized. We are planning to upsize the culvert to a 12’x5’ box culvert

In Development charlotte water

Charlotte Storm Water Services / Construction

Collective AJ

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-19045
  • Anticipated Posting Date: 2025-11-15
  • Last Updated: 10/02/25
Add to Calendar 2025-11-15 2025-11-15 Collective AJ

Collective AJ will consist of 4 projects (2033 Teddington Dr, 435 Norwood Drive, 2316 Kilborne Dr, and 10513 Moss Mill Ln).

In Development charlotte water

Charlotte Storm Water Services / Construction

Wood Dale Ter 2022

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-19043
  • Anticipated Posting Date: 2025-12-15
  • Last Updated: 10/02/25
Add to Calendar 2025-12-15 2025-12-15 Wood Dale Ter 2022

Project consists of removing a gabion wall and replacing it with a new segmental block wall.  Minimal stream impacts will be made only to install wall. Partial storm system in ROW will be removed and replaced with no outfall impacts.

In Development charlotte water

Charlotte Storm Water Services / Construction

2500 Briargrove Dr.

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-19039
  • Anticipated Posting Date: 2026-04-01
  • Last Updated: 10/02/25
Add to Calendar 2026-04-01 2026-04-01 2500 Briargrove Dr.

This project involves installing a closed drainage system down both Briargrove Dr. and Milton Rd. to reroute runoff from an existing stream. The proposed closed drainage system ties back into the existing culvert under Colby Pl.

In Development charlotte water

Charlotte Storm Water Services / Construction

718 Harwyn Dr.

  • Posting Number: 2026-Q2(Apr-Jun)-CSWS-19041
  • Anticipated Posting Date: 2026-04-26
  • Last Updated: 10/02/25
Add to Calendar 2026-04-26 2026-04-26 718 Harwyn Dr.

Project proposed to replace an existing culvert system under Harwyn Dr. with 2 – 3×5 box culverts, as well as a pipe cleaning effort through the triple 54” RCP culvert at downstream Eaves Ln.

In Development charlotte water

Charlotte Storm Water Services / Technology Goods & Services

NPDES MS4 SCM Compliance Software Solution

  • Posting Number: 2025-Q3(Jul-Sep)-CSWS-19012
  • Anticipated Posting Date: 2025-09-23
  • Last Updated: 10/02/25
Add to Calendar 2025-09-23 2025-09-23 NPDES MS4 SCM Compliance Software Solution

The City is seeking a software solution to support compliance with our NPDES MS4 permit, which mandates the tracking and enforcement of annual inspections for Stormwater Control Measures (SCMs).  The required system must be capable of managing SCM records, supporting inspection workflows, and generating permit-compliant reports.

In Development charlotte water

Charlotte Storm Water Services / Construction

Magnolia/Winthrop Storm Drainage Improvement Project

  • Posting Number: 2025-Q4(Oct-Dec)-CSWS-17297
  • Anticipated Posting Date: 2025-10-28
  • Last Updated: 10/02/25
Add to Calendar 2025-10-28 2025-10-28 Magnolia/Winthrop Storm Drainage Improvement Project

The Magnolia/Winthrop Storm Drainage Improvement Project (SDIP) consists of storm water infrastructure improvements along Ideal Way, Winthrop Avenue and Springdale Avenue. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, water and sewer (relocations, installations and adjustments), traffic control and any other associated work required by the Engineer.

 

In Development charlotte water

Charlotte Storm Water Services / Construction

Blackmon Storm Drainage Improvement Project

  • Posting Number: 2025-Q3(Jul-Sep)-CSWS-16844
  • Anticipated Posting Date: 2025-09-01
  • Last Updated: 10/02/25
Add to Calendar 2025-09-01 2025-09-01 Blackmon Storm Drainage Improvement Project

This project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, planning analysis of improvement alternatives, and design and construction of needed improvements.

The Blackmon Street Storm Drainage Improvement Project is bordered by Sampson Street to the north, Hoskins Road to the south, Ridgeley Drive to the east, and Sampson Street.

The need for this project was identified through citizen reported drainage requests including road flooding and complaints of finished floor (structure) flooding.

The purpose of the project will be to improve the storm drainage infrastructure to reduce flooding of streets and structures.

1 2 5 6