engineering-property-management-bluet  Department of General Services / Construction

Belk Greenway Connector

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2026-01-01 2026-01-01 Belk Greenway Connector

Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.

Posting Number 01 2026-Q1(Jan-Mar)-DGS-15892

Anticipated Posting Date 2026-01-01

Commodity Code(s): 55078, 74505, 80183, 91223, 91240, 91319, 91345, 91347, 91396, 91430, 96218, 96861, 96882, 96884, 98814, Tree

Belk Greenway Connector is a cycle track project. This project will involve shifting the medians on McDowell St to make room for the cycle track, replacing noncompliant curb ramps, replacing noncompliant pedestrian signals, transferring signal heads to new mast arms, mill & overlay, pavement markings, sign installation, and the removal of 4 median trees.

Requirements

Last Updated: 10/08/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Mackenzie Winebrenner

City Contact

980.214.7291

Mackenzie.Winebrenner@charlottenc.gov