aviation-bluet  Aviation / Construction

East Airfield Lighting Vault HVAC System

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-11-05 2024-11-05 East Airfield Lighting Vault HVAC System

This project includes the replacement of the existing cooling only HVAC system in the East Airfield Lighting Vault with the following:
– Purchase and installation of two (2) redundant 20-ton computer room air conditioning (CRAC) split systems
– Installation of one (1) Airport-furnished ductless split system heat pump for the control room
– Installation of one (1) Airport-furnished ductless cooling only split system for the IT closet
– Purchase and installation of one (1) 208V/3Ø subpanel and associated 45kVA transformer

Posting Number 2024-Q4(Oct-Dec)-AVI-15758

Anticipated Posting Date 2024-11-05

Commodity Code(s): 91450

This project includes the replacement of the existing cooling only HVAC system in the East Airfield Lighting Vault with the following:
– Purchase and installation of two (2) redundant 20-ton computer room air conditioning (CRAC) split systems
– Installation of one (1) Airport-furnished ductless split system heat pump for the control room
– Installation of one (1) Airport-furnished ductless cooling only split system for the IT closet
– Purchase and installation of one (1) 208V/3Ø subpanel and associated 45kVA transformer

Requirements

Last Updated: 09/09/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Andrew Buckner

City Contact

andrew.buckner@cltairport.com