charlotte-water-bluet  Charlotte Water / Construction

Briar Creek Phase 4 Sewer Rehab-CANCELLED

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon

Posting Number 06 2024-Q2(Apr-Jun)-CW-13471

Anticipated Posting Date 2024-06-20

Commodity Code(s): 91200, 91345, 91359, 91360, 91389

This will be an invitation to bid for construction and will consist of cured-in-place pipe lining, manhole rehab, and other miscellaneous services for several thousand linear feet of current infrastructure. This was originally paired with the Paw Creek/Diversion project and will now be two separate construction projects.

5/13/2024 – cancelled due to project reprioritization.

Requirements

Last Updated: 05/13/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Daniel Lindholm

City Contact

daniel.lindholm@charlottenc.gov