aviation-bluet  Aviation / Construction

North End-Around Taxiway (NEAT) Extension

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-05-07 2024-05-07 North End-Around Taxiway (NEAT) Extension

The Fourth Parallel Runway Program – North End-Around Taxiway (NEAT) Extension – Volume I includes the construction of 75 feet wide x 5,300 feet long new taxiway with two connector taxiways. Primary work elements include 18-inch Portland cement concrete pavement; cement-treated base course; crushed aggregate base course; asphalt shoulders; pavement markings; mass grading; 15” – 84” drainage pipes; cast-in-place and pre-cast structures; underdrains; airfield electrical including duct banks, cabling, lighting, and signage; erosion control; asphalt service roads; and fencing. The project also includes Stockpile Site – Volume II. Primary work elements include pavement, slab on grade, and foundation demolition; building demolition; utility removal; asphalt roadway; waterline installation; mass grading; erosion control; and fencing.

Posting Number 2024-Q2(Apr-Jun)-AVI-12916

Anticipated Posting Date 2024-05-07

Commodity Code(s): 74500, 90569, 91223, 91240, 91310, 96863, 98814, airfi, water

Solicitation Link: https://www.charlottenc.gov/Growth-and-Development/Doing-Business/Contract-Opportunities/NEAT-Extension

The Fourth Parallel Runway Program – North End-Around Taxiway (NEAT) Extension – Volume I includes the construction of 75 feet wide x 5,300 feet long new taxiway with two connector taxiways. Primary work elements include 18-inch Portland cement concrete pavement; cement-treated base course; crushed aggregate base course; asphalt shoulders; pavement markings; mass grading; 15” – 84” drainage pipes; cast-in-place and pre-cast structures; underdrains; airfield electrical including duct banks, cabling, lighting, and signage; erosion control; asphalt service roads; and fencing. The project also includes Stockpile Site – Volume II. Primary work elements include pavement, slab on grade, and foundation demolition; building demolition; utility removal; asphalt roadway; waterline installation; mass grading; erosion control; and fencing.

Requirements

Last Updated: 05/13/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com