Earlybird, Business Opportunity Pipeline, City of Charlotte

charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Collective AE Storm Drainage Improvement Project

Details

Print Download

Posting Number 11 2025-Q4(Oct-Dec)-CSWS-12652

Anticipated Posting Date 2025-11-04

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

Solicitation Link: https://charlottenc.bonfirehub.com/opportunities/209400

The Project consists of constructing Collective Storm Drainage Improvement Projects Series AE will involve 2 projects throughout the City of Charlotte, 4440 Holbrook Dr, 4611 Denver Av Phase 2. 4440 Holbrook Dr scope will include installation of approx. 26LF 30″ RCP; 90LF 36″ RCP; 110LF 29×45 Elliptical pipe; 7LF 24″ RCP; 77LF 15″ RCP; 29LF 15″ RCP Class IV. Approx 26 LF of 30″ RCP; 56LF 15″ RCP; 10 LF 36″ RCP will be removed and another approx. 200LF of RCP is to be plugged and abandoned. Scope also intends to replace approximately. 105LF of sewer with 8″ DIP and replace (2) sewer manholes. Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement to also be included. 4611 Denver Av Phase 2 scope will include removal of approximately 75 LF of duel 60″ CMP and installation of 65LF of a 10×5 RCBC. R&R 54 LF 6″ Water Main; Project to include approx. 314 LF of sewer replacement and (6) MHs. Scope also to include concrete headwalls, riprap, and full depth pavement resurfacing.concrete headwalls and full-depth pavement resurfacing.

Requirements

Last Updated: 11/21/25
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Facebook Logo X Logo

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov