charlotte-water-bluet  Charlotte Water / Construction

Belmont Pump Station Construction

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2025-04-15 2025-04-15 Belmont Pump Station Construction

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Posting Number 04 2025-Q2(Apr-Jun)-CW-12294

Anticipated Posting Date 2025-04-15

Commodity Code(s): 91200, 91340, 91359, 91360

This project will deliver a new pumping station and pressurized pipe to convey wastewater flow from the City of Belmont to Charlotte Water’s (CLTWater) Stowe Regional Wastewater Reclamation Facility via CLTWater’s Paw Creek Pumping Station. This project will allow the existing Belmont Wastewater Treatment Plant to be decommissioned and eliminate the need for costly improvements at this facility. Due to separate funding sources, the project will be delivered via Design-Bid-Build delivery method through two phases of design and three separate construction contracts.

Requirements

Last Updated: 08/21/24
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Daniel Lindholm

City Contact

daniel.lindholm@charlottenc.gov