Charlotte Storm Water Services / Construction
The Summerlin Place Storm Drainage Improvement Project will add additional catch basins along Summerlin Place and install a new drainage system down Wessynton Dr and a small portion of Brynwood Drive. The project consists of installation of RCP, CB’s, MH’s, C&G replacement, sewer line replacement, and CIPP lining.
Posting Number 09 2025-Q3(Jul-Sep)-CSWS-11509
Anticipated Posting Date 2025-09-12
Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915
Solicitation Link: https://charlottenc.bonfirehub.com/projects/202413/details
The Summerlin Place Storm Drainage Improvement Project will add additional catch basins along Summerlin Place and install a new drainage system down Wessynton Dr and a small portion of Brynwood Drive. The project consists of installation of RCP, CB’s, MH’s, C&G replacement, sewer line replacement, and CIPP lining.
Get updates on this opportunity by following the hashtag on Twitter or Facebook!