charlotte-storm-water-services-bluet  Charlotte Storm Water Services / Construction

Summerlin Storm Drainage Improvement Project

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-04-04 2024-04-04 Summerlin Storm Drainage Improvement Project

 

This project is on Brynwood Drive, Wessynton Drive, and Summerline Place. The existing drainage system consists of a pipe system under city-maintained roads. The improvements include pipe system upgrades.

 

Posting Number 04 2024-Q2(Apr-Jun)-CSWS-11509

Anticipated Posting Date 2024-04-04

Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915

 

This project is on Brynwood Drive, Wessynton Drive, and Summerline Place. The existing drainage system consists of a pipe system under city-maintained roads. The improvements include pipe system upgrades.

 

Requirements

Last Updated: 04/02/25
Insurance Requirements+
Bonding Requirements+
Estimated Total Value+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Facebook with Dark Blue Background Logo of X with Black Background

For Questions, Contact:

Jaime Thompson

City Contact

Jaime.Thompson@charlottenc.gov