The project includes the interior renovation and build-out of existing storage space and other minor renovations in the CLT Center located at 5601 Wilkinson Blvd. This will include relocating the existing conference room and Tech Help space in order for these spaces to be repurposed
CLT Center Phase 14 15
The project includes the interior renovation and build-out of existing storage space and other minor renovations in the CLT Center located at 5601 Wilkinson Blvd. This will include relocating the existing conference room and Tech Help space in order for these spaces to be repurposed
Track 4 Fall Protection
Charlotte Area Transit System is the largest Rail Transit System in North Carolina and has various maintenance needs along the rail lines. This is a solicitation for fall protection for Track 4 in the SBLRF. This will protect personnel from falling while performing maintenance on a light rail vehicle. The selected vendor will design, engineering, fabricate, and install a fall protection system for track four (4) middle and south sections of the South Boulevard Light Rail Facility.
PSR 1108