Barrington Drive 5919 Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is under review.  Location and project details will be provided after the review is complete.

Collective M (Sharon Hills)

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 7 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Collective L (Knightwood, Fair Valley) Storm Drain Improvement Project

The purpose and need for this construction project are to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 2 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after the review is complete.

Storm Water Repair and Improvement FY2022-H

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY2022-G

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY 2022-E

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY 2022-F

Work performed under this contract will consist of stormwater infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, stormwater pipe lining, stormwater pipe joint, and structure repair, water and sewer (relocations, installations, and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way

Linda Lake/Oakwood Pond Rehabilitation Project

Work includes removing trees and vegetation from the two dams, lowering the water surface at Linda Lake Dam and cleaning and inspecting the spill way as well as making any necessary repairs to the joints of the spill way.  Refreshing rip rap where needed on the dam embankments.  Installing piezometers at Linda Lake, and testing the operation of the bottom drains of the two lakes.

Collective Series K Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of three small storm drain improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.