This project will construct a new Aircraft Rescue and Firefighting Facility (ARFF) at Charlotte Douglas International Airport. The facility will be constructed in a green field site within the airfield. The general scope of the project includes site preparation (grading and drainage), building construction, HVAC, plumbing, asphalt parking lot and roadway paving, electrical, and associated utilities.
4th Parallel Runway Package 3: Parallel Taxiway and NAVAIDS
As part of the Fourth Parallel Runway Program at CLT, this construction package will include the new West Parallel Taxiway and its connector taxiways. The project includes erosion and sedimentation control, grading, drainage, airfield concrete and asphalt paving, fencing marking, and airfield lighting/signage.
To support CLT’s Fourth Parallel Runway Program, this project will also include the installation of Navigational Aids (NAVAIDs) for the new Fourth Parallel Runway. To support the new Runway 1C-19C, the project requires construction of glide slope, localizer, approach lighting systems, and all associated support structures, access roads, and infrastructure. The general scope of this bid package includes demolition, erosion and sedimentation control, grading, drainage, airfield electrical, vehicle service roads, and utilities.
Airport Main Entrance Landscape Additions
Work to include amending, planting, mulching, chemical application, watering, and all other operations as described herein to create an aesthetic extension to the existing landscape. Only areas circled on plan maps are in the current scope. To scale AutoCAD plans are available upon request. Work areas are at the intersection of Josh Birmingham and Wilkinson Blvd. and extend
up to the intersection of Scott Futrell. The contractor is responsible for all utility locates. Watering services shall be a part of the scope and performed as often as needed for one year after final acceptance to ensure all material remains in a healthy and viable growing condition. If during that time material becomes unacceptably dry or otherwise in poor condition due to watering or lack thereof the monthly payments shall not be made. Alternate: This work is to remove and replace all magnolias and all gingkos on the west side of
the road in between Scott Futrell and Wilkinson Blvd. with new material of the same species in a 3” caliper. Watering services are part of this alternate.
McMullen Creek Basin Rehabilitation
There are multiple project sites within the McMullen Creek basin. Sewer rehabilitation will be performed in sub-area sewer collection systems in the northern portion of the McMullen Basin and on portions of the existing McMullen trunkline and manholes within existing easements. Sewer rehabilitation will be performed on the existing collection system within existing easements and public road right-of-ways.
Vest Water Treatment Plant Clearwell No. 3 Roof Replacement
The Vest WTP’s Clearwell No. 3 existing precast concrete panels which already had its existing TPO Membrane roof demolished will be replaced with a new FRP Deck and TPO Membrane roof.
FY21 Water and Sewer Repairs
The Project consists of water and sewer repair for various streets, highways, parcels, and utility easements within Mecklenburg County.