This project will provide a roundabout at the intersection of Lakeview Road and Reames Road, and a sidewalk on Lakeview Road between Beatties Ford Road and Reames Road. This project is located in the Beatties Ford Road Comprehensive Neighborhood Improvement Program (CNIP) Area.
Kilborne Drive Streetscape
This project will improve Kilborne Drive from the Eastway Drive intersection to just South of Havenwood Road. Improvements include painted buffered bike lanes, sidewalk, ped crossing medians, traffic calming and street trees. Project connects to the Central/Kilborne/Norland project South of Havenwood Road. (Project length= 0.9 miles)
Uptown Cycle Track- 6th St Crossing Gate Construction
Project includes the installation of a crossing gate arm over 6th St. at the Lynx Blue Line in coordination with the 6th St. cycle track currently under construction by the Uptown Cycle Track project.
Sweden Road Concrete and Asphalt Pavement Project Phase 2
This project will install new concrete and asphalt pavement improvements at the Fleet Management Sweden Road shop.
Pleasant Grove Road Sidewalk- Cancelled
This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School. This project has been cancelled.
Shade Valley Realignment Project
Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.
Sharon Road Sidewalk CANCELLED
This project will install sidewalk along the west side of Sharon Road from Bramwyck Drive to Chandworth Road.
Pineville-Matthews Road/Alexander Road Sidewalk Project
This project will add sidewalk along Hwy 51 from Echo Forest Drive (Providence High School) to Alexander Road- and sidewalk on Alexander Road between Hwy 51 and Woodshed Court. The project will also add a right turn and a second left turn lanes on Alexander Road at Hwy 51. Project length= 1.0 mile.
Shamrock Drive Storm Drainage Improvement Project
This construction project is located near The Plaza and Shamrock Drive and has been identified to address flooding, erosion, and pipe failure in the project area.