The Portland Cement Concrete (PCC) Slab Replacement Program will include the rehabilitation and replacement of various airfield PCC pavement slabs that will be identified by the Owner. The intent of this solicitation is to select a company to provide rehabilitation and replacements utilizing selected construction materials for specific projects at various locations on Airport property on an as needed, Task Order basis during the duration of the scheduled contract. The Scope of Services requires the contractor to furnish all supervision, labor, materials, machinery, tools, equipment, and services, and perform and complete all work in an efficient and workmanlike manner necessary to complete construction of the PCC Slab Replacement Program.
Runway 18/36 and Taxiway Delta Rehab Construction
Charlotte Douglas International Airport (“CLT”) intends to issue an Invitation to Bid (“ITB”) for the rehabilitation construction of Runway 18L/36R and Taxiway D. The scope of this work will include but is not limited to asphalt milling, paving, airfield electrical work, and pavement makings.
Asphalt Shoulder Rehabilitation-Phase II
Taxiway Shoulder Pavement Repair Phase II includes the pavement repair of identified taxiway shoulders, runway shoulders, and a blast pad. The Project does not include providing or installing pavement markings, either new or the restoration of damaged existing markings. The bidder will be expected to reasonably avoid damaging existing pavement markings when possible. The Charlotte Douglas Airport (CLT) Airfield Maintenance (AFM) staff will install all necessary pavement markings as well as perform any electrical operations.
Snow Removal Assistance and Equipment for CLT Airport Airfield Ramps
The Company shall provide equipment, inclusive of operators and mechanics, as needed on a contingency basis within the Charlotte-Douglas International Airport’s Secure Airfield Area to address snow removal for the Terminal Ramp, Cargo Ramps, Access Routes, Fire Stations, and Fixed Base Operations Areas or as otherwise directed by CLT Staff. Company shall be available to mobilize 24/7, as needed.
Airfield Crack Sealing Repairs
Charlotte Douglas International Airport is seeking a contractor to perform crack sealing on CLT’s airfield. The work performed on the airfield will include working on runways, taxiways, aprons, and areas around the terminal ramp.
The working hours for this project will be from 11:15 pm to 5:30 am. The contractor will be required to provide all materials, equipment, labor to install crack sealant and cleaning for the work area. The airport will furnish and install
the required barricades for this project.
Decommissioning and Rehabilitation Runway 5-23
The Runway 5-23 Decommissioning and Rehabilitation project at Charlotte Douglas International Airport includes the decommissioning of the existing FAA NAVAIDs for Runway 5-23 and conversion of Runway 5-23 into a taxiway, including taxiway marking, lighting, and signage. The project also includes rehabilitation of the Runway 5-23 asphalt pavement in the form of a variable-depth mill and overlay as well as select concrete slab replacement for installation of taxiway centerline lights.
Taxiway F Deicing Pad South Crossfield Package-2 Paving and Electrical (Construction)
This project consists of all pavement and lighting for the new taxiway extensions and deicing pad construction. Specific work includes erosion control, asphalt paving, concrete paving, drainage installation, pavement markings, signage, conduit installation, electrical work, and associated miscellaneous items.