Sugar Creek 78” Sanitary Sewer Rehabilitation Project

The Project consists of rehabilitation of approximately 2,700 feet of 78-inch sanitary sewer via cured-in-place pipe lining (CIPP) including all preparatory work such as sewer cleaning nd television inspection, bypass pumping of wastewater flows, and complete restoration.

Site Improvements at Charlotte Water’s Field Operations, Zone 1 & 2

The Project consists of the repaving of two different Charlotte Water Facilities: Zone 1 which is located at 11609 Hord Drive Huntersville, NC 28078, and Zone 2 located at 5730 General Commerce Drive Charlotte, NC 28213. Zone 1 encompasses additional aspects besides the repaving, including a proposed storm drainage system, water and sanitary sewer extensions, and the enlargement of the existing detention pond. Zone 2 includes some storm drainage, curb and gutter, and concrete apart from the repaving.