This contract will be for the construction of an undetermined number of street mains extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.
Cancelled as of 3/25/2024.
This solicitation will be for the construction of an undetermined number of street main extensions and miscellaneous infrastructure projects. This contract will also provide construction assistance on an as-needed basis for other capital projects. This contract will cover Charlotte Water’s entire service area.
Cancelled as of 3/25
Project of approximately 16,000 Linear Feet of 36 inch water main along Albemarle Rd. This project improves the water transmission capacity in the 960 pipe zone. Project is in final design, permitting and easement acquisition.
Charlotte Water is soliciting Statement of Qualifications from a qualified engineering firm to provide survey, design, contract administration, and construction management (if necessary) of multiple pipeline replacement projects and other General Services as requested by the City. All work will be located within the Charlotte Water service area. The projects will be assigned to the Engineer during the course of the contract period as they become available. Projects may vary in size, length and scope, and are to be completed according to the individual project schedule.
This contract will be a work order based contract to provide construction services to Charlotte Water for the relocation or renewal of water services (3/4-inch and 1-inch), abandonment of small diameter water mains (12-inch and under), and installation of new water mains. The contract will consist of an undetermined number of individual water services relocations and other work areas throughout Mecklenburg County that will be assigned by the Engineer.
This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories and FRP (fiberglass reinforced plastic) enclosure.
This project will provide maintenance on the Mallard Creek Water Reclamation Facility’s potable and non-potable water systems. Work on this project will include repairs to valves, valve collars, hydrants, and the installation of an 8-inch non-potable water connection line. As part of the project, the existing non-potable water backflow preventer, associated accessories, and FRP (fiberglass reinforced plastic) enclosure.
This project consists of constructing one new elevated storage tank 2 MG (million gallons in size). There will be waterline work associated to extend the mainline to the tank site. The selected firm would be asked to provide clearing and grading services in preparation of the tank installation.