Collective M (Sharon Hills)

The need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 7 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Collective L (Knightwood, Fair Valley) Storm Drain Improvement Project

The purpose and need for this construction project are to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of 2 small Storm Drain Improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after the review is complete.

Storm Water Repair and Improvement FY2022-G

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.

Hidden Valley Firehouse #45

Design and construct a new 2-story, 3-bay firehouse at 14,626 square feet, to be located at 5800 North Tryon Street. This facility will be a new infill firehouse that will alleviate high call volume for surrounding firehouses. A new firehouse must be built when a new “point of dispatch” is required in order to meet response time standards.  The proposed facility will be located on a 2.03-acre parcel that facilitates the redevelopment of abandoned/underutilized sites and vacant sites. This location and site selection shall meet the City of Charlotte Policy for Sustainable City Facilities and Charlotte Fire Department Facilities Master Plan.

This project will pursue LEED certification. The site will incorporate solar panels and a geothermal well system with water source heat pumps.

Storm Water Repair and Improvement FY 2022-E

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way.

Storm Water Repair and Improvement FY 2022-F

Work performed under this contract will consist of stormwater infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping, and any associated work required by the Engineer.  Other work may include structural foundation protection, stormwater pipe lining, stormwater pipe joint, and structure repair, water and sewer (relocations, installations, and adjustments). Storm Water maintenance work may be located entirely within the street right-of-way

Linda Lake/Oakwood Pond Rehabilitation Project

Work includes removing trees and vegetation from the two dams, lowering the water surface at Linda Lake Dam and cleaning and inspecting the spill way as well as making any necessary repairs to the joints of the spill way.  Refreshing rip rap where needed on the dam embankments.  Installing piezometers at Linda Lake, and testing the operation of the bottom drains of the two lakes.

Collective Series K Storm Drainage Improvement Project

The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality.  This project is a collective package of three small storm drain improvement projects that will be constructed under one contract.  This project package is under review and location and project details will be provided after review is complete.

Storm Water Repair and Improvement FY 2022-D

Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC.  Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer.  Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments).  Storm Water maintenance work may be located entirely within the street right-of-way.