Pleasant Grove Road Sidewalk- Cancelled

This project will construct sidewalk along the south side of Pleasant Grove Road from Hipp Road to Oakdale Elementary School.   This project has been cancelled.

Shade Valley Realignment Project

Construction of a roundabout at the Shade Valley Road/ Oakhurst Commons Drive intersection and installing a 10 to 12 ft. concrete multi-use path along Monroe Road. Amenities include: sidewalk curb & gutter, planting strips, accessible ramps truck apron, pedestrian refuge islands, and a sand filter stormwater detention pond.

Matheson Avenue Bridge Streetscape

This project will incorporate pedestrian, bicycle and bridge improvements on Matheson Avenue from North Tryon Street to Jordan Place. The project will include a westbound one-way bicycle path along the north side of Matheson Avenue and a two- way bicycle path and sidewalk along the south side. Both sides will include a three-foot buffer between the bicycle paths and the road.

16th Street Streetscape Phase 2

This project is the second phase of 16th Street Streetscape project. Streetscape improvements include concrete sidewalk and ramps, curb and gutter, storm drainage, erosion control, slope grading work, and installation of a soil nail retaining wall on 16th Street adjacent to the Norfolk Southern parcel, at the northeast corner of N. Tryon Street and 16th Street intersection.

Mallard Creek Water Reclamation Facility (WRF) & Lee S. Dukes Water Treatment Plant (WTP) Standby Power & Electrical Improvements – Cancelled

The first project site is the Mallard Creek Water Reclamation Facility located at 12400 US 29 HWY, Charlotte, North Carolina 28262. The scope of work for this project is a new standby generator facility, the conversion of the existing utility service from 480V to 4160V, electrical upgrades to the existing blower building and the replacement of an existing electrical switchboard. The second project is the Lee S Dukes Water Treatment Plant located at 7980 Babe Stillwell Road, Huntersville, North Carolina 28078. The scope of work for this project is a new standby generator facility, the replacement of the existing 4kV switchgear and 4kV electrical duct bank to re-feed the existing transformers.