Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.

Charlotte Storm Water Services / Construction
Piccadilly Storm Drainage Improvement Project

Charlotte Storm Water Services / Construction
1206 Georgetown Storm Drainage Improvement Project
The project is bounded by Pondella Drive to the West and North, Georgetown Drive to the South and Rosada Ave to the East. The project involves storm drainage improvements along Georgetown Rd primarily with some improvements in intersections with Rosada Avenue and Pondella Drive.

Charlotte Storm Water Services / Construction
Hastings Princeton Storm Drainage Improvement Project
The Hastings/Princeton Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 80 acres, the project will replace aging infrastructure and provide adequate system capacity. The project area is bordered by Wellesley Avenue to the north, Hastings Drive to the south, Selwyn Avenue to the east and Jamestown Drive to the west.

Charlotte Storm Water Services / Construction
Edgewater/Rosecrest Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.

Charlotte Storm Water Services / Construction
Chatham Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.

Charlotte Storm Water Services / Construction
6th and Graham Storm Drainage Improvement Project
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.

Charlotte Storm Water Services / Construction
Euclid Avenue 1818 Storm Drainage Improvement Project
The project involves analysis of existing conditions to determine portions of the storm drainage system needing improvement, and design and construction of needed improvements. The existing storm system experienced a pipe collapse due to poor condition of the pipe. To address the request and meet level of service design standards the project will remove and replace the existing Storm Drainage Infrastructure within the project scope.
Proposed improvements include removing approximately 343 LF of 18″ storm water pipe and replace with approximately 410 LF of 24″ storm water pipe, add 2 double catch basins and associated items, and remove and replace approximately 357 LF of 8″ sewer pipe, and 3 sewer manholes.

Aviation / General Services
Fuel System Maintenance and Quality Assessment Services
The project provides sitewide fuel system maintenance and fuel quality assessment services, including inspection, testing, and preventative maintenance of fuel tanks and associated fuel system components. This contract will be term based and services will be provided as needed.

Aviation / Architectural / Engineering Services
Environmental Consulting and Remedial Services
The Charlotte Douglas International Airport (CLT) is seeking a Statement of Qualifications from qualified firms to provide environmental assessment and remedial services. Services will include ongoing spill remediation for NCDEQ UST Section Incident #18989, involving comprehensive site assessment and long-term corrective action activities. Work includes assessment and reporting, site monitoring, absorbent pad and boom maintenance, and operations and maintenance of two (2) dual-phase extraction systems and associated Physical Chemical 1 wastewater treatment systems. The anticipated duration of the project is approximately 5–10 years.
The purpose and need for this construction project is to improve the storm drainage infrastructure (i.e. pipe systems and culverts) to reduce flooding and to enhance degraded stream reaches to reduce erosion and improve water quality. This project is under review. Location and project details will be provided after review is complete.