Opportunities per Page
/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
Solicitation Category
- Architectural / Engineering Services
- Commodities & Goods
- Construction
- Construction Cost Estimating
- General Services
- Technology Goods & Services
Utilization
- SBE-Small Business Enterprise
- DBE-Disadvantaged Business Enterprise
- MBE-Minority Business Enterprise
- WBE-Women Owned Business Enterprise
Expected Release Date
From Date
To Date
Estimated Total Value
- $10,000 - 49,999
- $50,000 - 99,999
- $100,000 - 249,999
- $250,000 - 499,999
- $500,000 - 999,999
- $1,000,000 -4,999,999
- $5,000,000 - 9,999,999
- $10,000,000+
In Development
Charlotte Department of Transportation / General Services
Asphalt Rejuvenating Application Services
In Development
Charlotte Department of Transportation / General Services
Locating Services for the Charlotte Department of Transportation (CDOT ... Locating Services for the Charlotte Department of Transportation (CDOT)
- Posting Number: 2024-Q4(Oct-Dec)-CDT-16377
- Anticipated Posting Date: 2024-12-31
- Last Updated: 12/11/24
This contract will be for fiber optic cable physical locating, marking, and positive responses to NC811 of CDOT’s underground infrastructure as required by the Underground Utility Safety and Damage Prevention Act, Article 8A of Chapter 87 of the North Carolina General Statutes. Work provided under this contract is to supplement CDOT’s current in-house locates unit and will cover the city of Charlotte limits.
In Development
Department of General Services / Construction
Lawyers Rd SW (Harri Ann to Chestnut)
- Posting Number: 2026-Q4(Oct-Dec)-DGS-16279
- Anticipated Posting Date: 2026-10-01
- Last Updated: 11/05/24
The scope of this project will include 0.34 miles of new 6ft wide concrete sidewalk, driveway improvements, and wheelchair ramps on Lawyers Rd from Chestnut Lake Dr to Harri Ann Dr.
In Development
Department of General Services / Construction
Morris Field Bridge Replacement
- Posting Number: 2025-Q2(Apr-Jun)-DGS-8971
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/28/24
This project will replace the bridge on Morris Field Drive between Wilkinson Boulevard and Golf Acres Drive, over the Norfolk Southern Railroad.
In Development
Department of General Services / Construction
DeArmon Road Improvements Project
- Posting Number: 2026-Q2(Apr-Jun)-DGS-5221
- Anticipated Posting Date: 2026-04-01
- Last Updated: 10/28/24
The DeArmon Road Improvements Project is part of the City of Charlotte’s Prosperity Village Comprehensive Neighborhood Improvement Program. The project will complete the infrastructure needs in the neighborhood by providing buffered bicycle lanes, median/turning lane, storm drainage, curb & gutter, sidewalk and a greenway passage beneath DeArmon Road for the future extension of Clark’s Creek Greenway.
In Development
Department of General Services / Construction
Monroe Road Streetscape
- Posting Number: 2025-Q2(Apr-Jun)-DGS-8925
- Anticipated Posting Date: 2025-04-01
- Last Updated: 10/28/24
Improvements on Monroe Road between North Wendover Road and Eaton Road to create a more pedestrian-oriented corridor and install a pedestrian hybrid beacon in front of Time Out Youth Center. Improvements will primarily include shared-use paths, drainage, and midblock pedestrian crossings.
In Development
Department of General Services / Construction
Central Kilborne Norland Intersection & Street Upgrade
- Posting Number: 2025-Q3(Jul-Sep)-DGS-8945
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/28/24
Limits are from Woodland Dr. to just south of Havenwood Rd. / Kilborne Dr. intersection (.87 miles). The project includes a new urban greenspace named Potter Place (including public art), separated bike lanes, protected intersection improvements at Central Ave., wayfinding, storm drainage, street trees, and pedestrian medians.
In Development
Department of General Services / Construction
Brown Grier Road Upgrades
- Posting Number: 2026-Q3(Jul-Sep)-DGS-8941
- Anticipated Posting Date: 2026-07-01
- Last Updated: 10/28/24
This project will widen the two-lane road to a four-lane median-divided road with multi-use paths between Steele Creek Road and Whitehall Park Drive, and a multi-use path north along Sandy Porter Road to the subdivision at Williams Glenn Road.
In Development
Department of General Services / Construction
Prosperity Church Road (Old Ridge to Benfield) Improvements
- Posting Number: 2024-Q4(Oct-Dec)-DGS-9862
- Anticipated Posting Date: 2024-11-12
- Last Updated: 10/28/24
The project proposes to widen Prosperity Church Rd approximately 0.3 mi between Old Ridge Rd and Benfield Rd to provide curb and gutter, sidewalk, storm drainage, bicycle lanes, and on-street parking, as well as a roundabout at Prosperity Church Rd and Prosperity Ridge Rd.
In Development
Department of General Services / Construction
Idlewild Road/Rama Road/Monroe Road Intersection
- Posting Number: 2025-Q3(Jul-Sep)-DGS-8922
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/28/24
This project will improve the Idlewild Road and Monroe Road intersection to enhance conditions for all users. Improvements will include pavement widening to accommodate dual left turn lanes at all intersection approaches, bike lanes or multi-use paths, pedestrian refuge islands, and new sidewalks.
In Development
Department of General Services / Construction
Monroe Road Multi Use Path (MUP)
- Posting Number: 2025-Q1(Jan-Mar)-DGS-9854
- Anticipated Posting Date: 2025-01-01
- Last Updated: 10/27/24
The purpose of this project is to provide safer pedestrian conditions along Monroe Road from Eaton Road to McCullen Way. Currently, there are two active city projects in the vicinity of this project. This MUP will fill a key gap between these two projects, providing a safer and more connected route for pedestrians and cyclists.
In Development
Department of General Services / Construction
Shamrock Drive Complete Street
- Posting Number: 2025-Q3(Jul-Sep)-DGS-9860
- Anticipated Posting Date: 2025-07-01
- Last Updated: 10/27/24
Project limits are from Beckwith Place to Flamingo Ave (0.9 miles). Project includes new turn lanes, sidewalks, painted buffered bike lanes, two roundabouts, wheelchair ramps, ped medians, driveways, curb and gutter, storm drainage, street trees, public art and pedestrian crossings.
The Contractor shall furnish all labor, material, and equipment necessary to perform all services for the application of asphalt-rejuvenating agent to asphaltic concrete surfaces at various locations throughout the City of Charlotte. The rejuvenation of surface roads shall be by spray application of a cationic rejuvenating agent composed of petroleum oils and resins emulsified with water. All work shall be in accordance with the specifications, and the applicable drawings, and subject to the terms and specifications conditions of the contract.