Opportunities per Page
/ Opportunities
Welcome to EarlyBird, the City of Charlotte Business Opportunities Pipeline! This site is a comprehensive listing of Active and In Development contracting opportunities across all City of Charlotte departments. Projects can be searched using keywords, by commodity code, or using a variety of filters to narrow down opportunities your business may be interested in participating in. Click on the orange Requirements button on the Opportunity to see additional details about the project and specific requirements that may be helpful in preparing to participate in an upcoming solicitation. You can also “follow” a project using various social media channels to get notifications when the requirements are updated, or once the project moves from “In Development” to “Active” status.
If you have questions or need assistance with this portal, contact City Procurement at earlybird@charlottenc.gov.
Department
- Aviation
- Charlotte Area Transit System
- Charlotte Communications & Marketing
- Charlotte Department of Transportation
- Charlotte Fire Department
- Charlotte Mecklenburg Police Department
- Charlotte Planning, Design & Development
- Charlotte Storm Water Services
- Charlotte Water
- City Attorney’s Office
- City Clerk
- City Manager's Office
- City Wide
- Community Relations
- Department of General Services
- Economic Development
- Finance
- Housing & Neighborhood Services
- Human Resources
- Innovation & Technology
- Internal Audit
- Solid Waste Services
- Strategy & Budget
Solicitation Category
- Architectural / Engineering Services
- Commodities & Goods
- Construction
- Construction Cost Estimating
- General Services
- Technology Goods & Services
Utilization
- SBE-Small Business Enterprise
- DBE-Disadvantaged Business Enterprise
- MBE-Minority Business Enterprise
- WBE-Women Owned Business Enterprise
Expected Release Date
From Date
To Date
Estimated Total Value
- $10,000 - 49,999
- $50,000 - 99,999
- $100,000 - 249,999
- $250,000 - 499,999
- $500,000 - 999,999
- $1,000,000 -4,999,999
- $5,000,000 - 9,999,999
- $10,000,000+
In Development
Aviation / Commodities & Goods
Airfield Deicing Chemicals
In Development
Aviation / Construction
CLT Center Storm Drainage Project
- Posting Number: 2024-Q4(Oct-Dec)-AVI-10761
- Anticipated Posting Date: 2024-10-31
- Last Updated: 04/21/23
This project is located in a parking lot behind the CLT Center located at 5601 Wilkinson Boulevard in Charlotte, NC. The purpose of the project is to install new pipe to contain and drain runoff from the building to an existing storm drainage system at the rear of the parking lot. The work involves installation of reinforced concrete pipe, storm drainage structures, asphalt surface, and re-striping the parking lot within the construction corridor.
In Development
Aviation / Architectural / Engineering Services
Center Lighting Vault Relocation (Design)
- Posting Number: 2025-Q4(Oct-Dec)-AVI-8874
- Anticipated Posting Date: 2025-12-31
- Last Updated: 02/20/23
The Center Lighting Vault Relocation Project will relocate the existing lighting vault, located at the Mid-Field area at CLT Airport to a new proposed location. The project will consist of site work, building work, site utilities, and airfield lighting circuitry.
The selected Final Design Engineer or Engineer of Record (EOR or Consultant) will produce Construction Documents to be issued for competitive bidding of one or multiple construction packages, followed by Conformed or Released for Construction Plans issued to the responsive or responsible bidder for Construction. The design and documents are to be based on Preliminary Design or bridging documents prepared by the Owner’s Master Civil Engineer (Aviation Consulting Engineers, LLC, or ACE). The Preliminary Design effort will include completion of the Design Geotechnical Subsurface Investigation, preliminary design plans to a 30% level of completion, pavement design, and preliminary surveys. Final Design surveys, including pavement tie-ins, etc. will be the responsibility of the Consultant.
Provide airport with liquid and solid deicing chemicals during inclement winter weather events. Liquid and solid deicing chemicals are used throughout the facility to treat surfaces to minimize the formation of ice.