Aviation / Construction
CEP Chiller 5 Expansion
Details
The scope of this project is to connect one 2000-ton chiller (owner furnished and set on equipment pad) and corresponding mechanical equipment to the CEP. The addition of the chiller will also include the installation of one 2000-ton rooftop cooling tower, one chilled water pump, removal of existing filtration systems, new side filtration skids, and one condenser water pump. Existing structure and piping will be extended as needed to accommodate the installation of the listed equipment.
Posting Number 02 2025-Q1(Jan-Mar)-AVI-16092
Anticipated Posting Date 2025-02-17
Commodity Code(s): 92830, 96246
The scope of this project is to connect one 2000-ton chiller (owner furnished and set on equipment pad) and corresponding mechanical equipment to the CEP. The addition of the chiller will also include the installation of one 2000-ton rooftop cooling tower, one chilled water pump, removal of existing filtration systems, new side filtration skids, and one condenser water pump. Existing structure and piping will be extended as needed to accommodate the installation of the listed equipment.
Requirements
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!