This project includes HVAC and Plumbing equipment replacements for Charlotte Fire Station #37, located at 13828 South Tryon St, Charlotte, NC 28278. The scope of work includes replacing five (5) roof top air conditioning units with gas heating, one (1) roof mounted energy recovery ventilator, two (2) gas fired water heaters, and related updates to power and controls for all roof top equipment and interior VVT zone dampers. All work is to be completed in a manner to allow Charlotte Fire to maintain full access and use of the facility during the entire scope of the project.
Old City Town Hall Roof Replacement project
Removal and disposal of all existing asphalt built-up roof system, metal flashings, and counter flashings. Existing metal wall panels and balustrades are to remain. Furnish and install new single ply PVC roof system consisting of new flat and tapered polyisocyanurate insulation, gypsum cover board, fully adhered 50 mil PVC membrane and all flashings, wood blocking and metal flashings. Furnish and install new liquid applied drain re-lining at two (2) existing overflow drains and drain leaders. Remove and reinstall all existing surveillance and electrical equipment needed to complete the reroofing work. All disturbed rooftop equipment is be returned to original functionality after completion of the roofing project. Removal and disposal of all existing asphalt built-up roof system, metal flashings, counter flashings, gutters and downspouts. Furnish and install new single ply PVC roof system consisting of new flat and tapered polyisocyanurate insulation, gypsum cover board, fully adhered 60 mil PVC membrane and all flashings, wood blocking, metal flashings, gutters and downspouts. Remove existing metal roof panels in a manner that will allow for re- installation without damage. Install new high-temperature underlayment and re-install existing metal roof panels. Incorporate metal roof panels into above and below single ply roofing systems.