Cancelled – Hitachi Rail STS Inventory Spare Parts and Repair Service Contract

Light Rail Train Control and Signaling Systems. The parts that are being purchased under this contract are for replacement parts and inventory stock spares required to maintain the tracks signaling system, grade crossings and train control.

This was a sole source and should not have been entered in EarlyBird

PSR-1055

Cancelled LB Foster LRV Track Lubricating Equipment & Carbon Lubricators

The spare parts that are being purchased are for maintenance replacement spares required to maintain the LYNX Blue Line track lubricating equipment. These items are being purchased from the original OEM in order to guarantee interchangeability with existing hardware.

Sole Source – should not have been put in Earlybird

PSR-852