A 12’ wide shared-use path will be installed along WT Harris Blvd, from JW Clay Blvd to N Tryon St. This includes pedestrian ramps, storm drain services, and new pavement markings in addition to the shared-use path. Project Length = 0.33 miles.
On-Call Surveying Services for Various Airport Projects – CANCELLED
The scope of this contract shall be to provide on call surveying services for various airport projects for Charlotte Douglas International Airport.
The term of the Contract shall be for three (3) years with the option for two (2), one (1) year renewals.