McDowell Creek Capacity and Enhancement Program

This project will increase treatment capacity at the McDowell WRRF. Work will include but is not limited to designing a new BTB, RAS and WAS pumps, a new RAS distribution box, new hydro cyclones, and improvements to the blower building.

Mallard Connector Main

This project provides increased hydraulic capacity to the Mallard Tank, which will enable it to trend better with the Huntersville Tank. This will eliminate the need to throttle inlet valve at Huntersville Tank, which will result in energy savings by reducing discharge HGLs at pump stations. It will also provide higher capacity for water to be leaked through the Mallard PRV from the 978 into the 882 in emergency scenarios.