ENGINEERED MATERIAL ARRESTING SYSTEM (EMAS) Replacement

The project consists of the in-kind replacement of the Runway 36R Departure EMAS, including the removal of existing EMAS blocks, milling/overlay of existing asphalt bed, installation of new EMAS, placement of markings, and installation of edge reflectors

Cell Phone Lot Auxiliary Lane

The Cell Phone Lot Auxiliary Lane project will provide a full auxiliary lane along Josh Birmingham Highway that spans from the Cell Phone Lot and Long Term 1 Bus Exit to the entrance of the Cell Phone Lot. This project includes construction of a modular precast block wall, traffic control, erosion and sedimentation control, grading, drainage, construction of curb and gutter, landscaping, relocation of light and banner poles, asphalt paving, fencing, and signage.