aviation-bluet  Aviation / Construction

West Blvd. Relocation (Construction)

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2024-02-05 2024-02-05 West Blvd. Relocation (Construction)

This project is associated with the Airport’s 4th Parallel Runway Project. West Boulevard will need to be relocated to Piney Top Drive and Byrum Drive in order to create space for the 4th Parallel Runway and South End-Around Taxiway. Intersection improvements and roadway widening will occur at various locations along the corridor

Posting Number 2024-Q1(Jan-Mar)-AVI-3132

Anticipated Posting Date 2024-02-05

Commodity Code(s): 91310

This project is associated with the Airport’s 4th Parallel Runway Project. West Boulevard will need to be relocated to Piney Top Drive and Byrum Drive in order to create space for the 4th Parallel Runway and South End-Around Taxiway. Intersection improvements and roadway widening will occur at various locations along the corridor

Requirements

Last Updated: 05/31/22
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Gary Peeples

City Contact

ghpeeples@cltairport.com