Vest Force Main & Pump Station to Franklin and Lee Duke Water Treatment Plant Chem Feed Improvements

Details

A Blue Printer Icon to Print Anything A Small Blue Download Icon
Add to Calendar 2023-01-24 2023-01-24 Vest Force Main & Pump Station to Franklin and Lee Duke Water Treatment Plant Chem Feed Improvements

Construction of approximately 15,000 linear feet of 16” force main between the Vest Water Treatment Plant and the Franklin Water Treatment Plant.

Installation of 6,000 LF of new 3-inch x 6-inch diameter double wall containment pipe for new chlorine dioxide chemical feed system, including all
appurtenances, leak detection system, electrical, testing, and final commissioning. Installation of two (2) new 2-inch diameter HDPE raw water sample lines (approximate length is 6,000 LF for each), including all appurtenances, and testing. Installation of a new raw water sample pump,
casing, piping, appurtenances, electrical, and testing at the Raw Water Intake at Blythe Landing. Removal and replacement of various chemical feed lines (11/2-inch and 4-inch diameter) inside existing 8-inch and 12-inch diameter casing pipes. Installation of new fiber optic cable (approximately 6,000 LF) between the Lee S. Dukes WTP and the Raw Water Intake. Installation of new potable water line from Highway 73 to existing Compressor Building, including all appurtenances, and testing.

Posting Number 2023-Q1(Jan-Mar)-CW-9634

Anticipated Posting Date 2023-01-24

Commodity Code(s): 91200, 91223, 91356, 91360, 91389

Construction of approximately 15,000 linear feet of 16” force main between the Vest Water Treatment Plant and the Franklin Water Treatment Plant.

Installation of 6,000 LF of new 3-inch x 6-inch diameter double wall containment pipe for new chlorine dioxide chemical feed system, including all
appurtenances, leak detection system, electrical, testing, and final commissioning. Installation of two (2) new 2-inch diameter HDPE raw water sample lines (approximate length is 6,000 LF for each), including all appurtenances, and testing. Installation of a new raw water sample pump,
casing, piping, appurtenances, electrical, and testing at the Raw Water Intake at Blythe Landing. Removal and replacement of various chemical feed lines (11/2-inch and 4-inch diameter) inside existing 8-inch and 12-inch diameter casing pipes. Installation of new fiber optic cable (approximately 6,000 LF) between the Lee S. Dukes WTP and the Raw Water Intake. Installation of new potable water line from Highway 73 to existing Compressor Building, including all appurtenances, and testing.

Requirements

Last Updated: 10/26/22
Insurance Requirements+
Contract Term+
Estimated Total Value+

Follow This Opportunity!

Get updates on this opportunity by following the hashtag on Twitter or Facebook!

Logo of Twitter with Blue Background Logo of Facebook with Dark Blue Background

For Questions, Contact:

Alishia Nugent

City Contact

alishia.nugent@charlottenc.gov