4th Parallel Runway (Construction)
Details


Add to Calendar
2024-08-05
2024-08-05
4th Parallel Runway (Construction)
Scope of Work Construction of new 4th Parallel Runway
This program includes the planning, design, and construction of a 10,000-foot parallel runway and associated taxiway system to include the North End Around Taxiway Phase II and South End Around Taxiway. The 2016 Airport Capacity Enhancement Plan and 2018 FAA-approved forecast show the need for an additional runway at CLT. This runway will replace the existing crosswind runway and enhance capacity as the parallel configuration will provide greater operational benefit for more efficient air traffic flow into and out of CLT.
Posting Number 2024-Q3(Jul-Sep)-AVI-3134
Anticipated Posting Date 2024-08-05
Commodity Code(s): 91310
Scope of Work Construction of new 4th Parallel Runway
This program includes the planning, design, and construction of a 10,000-foot parallel runway and associated taxiway system to include the North End Around Taxiway Phase II and South End Around Taxiway. The 2016 Airport Capacity Enhancement Plan and 2018 FAA-approved forecast show the need for an additional runway at CLT. This runway will replace the existing crosswind runway and enhance capacity as the parallel configuration will provide greater operational benefit for more efficient air traffic flow into and out of CLT.
Requirements
Last Updated: 05/31/22
Insurance Requirements+
Bonding Requirements+
Subcontracting Opportunities+
Estimated Total Value+
Utilization+
Contract Term+
Follow This Opportunity!
Get updates on this opportunity by following the hashtag on Twitter or Facebook!
Tweets by EarlyBirdCLT